Friday, February 15, 2013

My coonoor visit


The NMR track is 1,000 mm (3 ft 3 38 in) gauge and the railway is isolated from other metre gauge lines.
Between Mettupalayam and Coonoor, the line uses the Abt rack and pinion system to climb the steep gradient. On this rack section trains are operated by 'X' Class steam rack locomotives manufactured by the Swiss Locomotive and Machine Works of Winterthur in Switzerland. These steam locomotives can be used on any part of the line (either with or without the rack section),but the newer diesel locomotives can operate on the entire section, between Mettupalayam and Udagamandalam.This signals the beginning of the process to phase out the coal-fired vintage Swiss engines that took scores of passengers on the rack and pinion track to Coonoor and Udhagamandalam, covering 41.8 km, 108 curves, 16 tunnels and 250 bridges
Hence, the Southern Railway decided to replace the coal-fired locomotives. The work was entrusted to Golden Rock Workshop of Southern Railway at Tiruchirapalli. Each of the new engines weighs a little over 50 tonnes and cost Rs.10 crore.
The new engine has been provided with pilot and primary burners with separate tanks to hold about 850 litres of diesel and 2,250 litres of furnace oil. The hauling capacity of this new engine is 97.6 tonnes and it can run at a speed of 30 km an hour in plains and at 15 km an hour on a gradient.
Officials hoped to put the engine to use by Sunday on the Mettuppalayam–Coonoor section. The arrival of the new engines raises hopes of eliminating the disruption in service that occurred frequently over the last two years.
For long, the X Class locomotives manufactured by Swiss Locomotive and Machine Works of Winterthur in Switzerland lent that distinct charm to NMR. These locomotives are six to eight decades old, railway officials said
The steam locomotives are always marshalled at the downhill (Mettupalayam) end of the train. The average gradient in this rack section is 1 in 24.5 (4.08%), with a maximum of 1 in 12 (8.33%).

Mettupalayam-Ooty Mountain Train Hauled By Diesel Locomotive Approaching Wellington Station

Nilgiri Mountain Train Hauled By YDM4 Locomotive
Between Coonoor and Udagamandalam the train is operated by a YDM4 diesel locomotive using conventional rail adhesion principles. On this section the locomotive is always at the Coonoor end of the train as although the line is not steep enough to need a rack rail, the ruling gradient out of Coonoor is still very steep at 1 in 25 (4%).

Steam Locomotive
As of 2007, there is one train a day over the rack section, which starts from Mettupalayam at 07:10 and reaches Ooty at noon. The return train starts from Ooty at 15:00, and reaches Mettupalayam at 18:35. The train is scheduled to connect to the Nilgiri Express, which travels from Mettupalayam to Chennai via Coimbatore. A summer special service is also run during the months of April and May, starting from Mettupalayam at 09:30 and from Ooty at 12:15. Between Coonoor and Udagamandalam, there are four daily trains each way.

NMR issues old style tickets, keeping in line with the World Heritage Site status.
Even though the NMR stations have networked computerised ticketing systems for onward journeys, it still issues Edmondson style manual tickets for the Ooty-Mettupalayam journey to preserve the 'World Heritage Site' status of the railway. However, ticket booking is similar to other conventional trains and can also be done via the Indian Railways' website.[4] It is advisable to book tickets for this railway in advance, especially during peak season.
The majority of repairs to the locomotives are carried out at the Coonoor shed but many of the steam locomotives have been rebuilt at the Golden Rock Workshops. Carriages are repaired at Mettupalayam but, like the locomotives, are taken to one of the big railway workshops for major work. Due to its popularity, a number of passengers using the NMR have requested that the Southern Railways convert the section from Coonoor to Udagamandalam to steam locomotive[citation needed], extending the present steam traction between Mettupalayam and Coonoor.

[edit] The route

[hide]Nilgiri-Mountain Railway
Head station
0 kmMettupalayam(Coimbatore)
Stop on track
8 kmKallar
Station on track
13 kmAdderly
Stop on track
18 kmHillgrove
Stop on track
21 kmRunneymede
Stop on track
25 kmKateri Road
Station on track
28 kmCoonoor
Station on track
29 kmWellington
Stop on track
32 kmAruvankadu
Stop on track
38 kmKetti
Station on track
42 kmLovedale
End station
46 kmOoty
The 'Nilagiri Passenger' train covers a distance of 26 mi (41.8 km),[2] travels through 208 curves, 16 tunnels,[2] and 250 bridges.[2] The uphill journey takes around 290 minutes (4.8 hours), and the downhill journey takes 215 minutes (3.6 hours) It has the steepest track in Asia with a maximum gradient of 8.33%.[2]





 




Nilgiri Mountain Railway on the biggest bridge
Mettupalayam Station
Mettupalayam(Coimbatore) - 0 km (0 mi), 1,069 ft (325.8 m) above sea level - Junction with the 5 ft 6 in (1,676 mm) (Indian Gauge) line from Coimbatore city railway station. Passengers cross the platform to board the Nilagiri Passenger train (NMR). There is a small locomotive shed here and also the carriage workshops for the line.
Leaving Mettupalayum, the line is adhesion worked and actually drops for a short distance before crossing the Bhavani River, after which it starts to climb gently.
Kallar Station
Kallar - 8 km (5 mi), 1,260 ft (384 m) - Closed as a passenger station, this is where the rack rail begins. As the train leaves the station, the gradient is 1 in 12 (8.33%).
Adderly Station
Adderly - 13 km (8.1 mi), 2,390 ft (728.5 m) - Closed as a passenger station but is still a water stop.
Hillgrove Station
Hillgrove - 18 km (11.2 mi), 3,580 ft (1,091.2 m) - Block post and water stop, also has refreshments for passengers.
Runneymede Station
Runneymede - 21 km (13 mi), 4,612 ft (1,405.7 m) - Closed as a passenger station but is still a water stop.
Kateri Road Station
Kateri Road - 25 km (15.5 mi), 5,070 ft (1,545.3 m) - Closed as a passenger station, trains do not stop here.
Coonoor Station
Coonoor - 28 km (17.4 mi), 5,616 ft (1,711.8 m) - main intermediate station on the line at site of the locomotive workshops as well as the top end of the rack rail. Trains must reverse a short distance before continuing their climb to Ooty. It is normal for the locomotive to be changed here with diesel traction, being normal for all trains to Ooty.
Wellington Station
Wellington - 29 km (18 mi), 5,804 ft (1,769.1 m)
Aruvankadu StationAruvankadu - 32 km (19.9 mi), 6,144 ft (1,872.7 m)Ketti Station
Ketti - 38 km (23.6 mi), 6,864 ft (2,092.1 m)

The Nilgiri Passenger at Ketti Railway Station
Lovedale Station
Lovedale - 42 km (26.1 mi), 7,000 ft (2,133.6 m)

Lovedale railway station
From a short distance before Lovedale, the line descends into Ooty.
Udhagamandalam Station
Ooty - 46 km (28.6 mi), 7,228 ft (2,203.1 m).

No comments:

Post a Comment